Galatsi Indoor Olympic Hall was built especially for the Athens Olympic Games, in order to host the rhythmic gymnastics and table tennis events. It was designed by the Study Office of Alexandros Topazis and built by the company Embedos, with a cost that reached €43,000,000. Construction work began in November 2001 and the indoor space was inaugurated (albeit incomplete) on 28 January 2004 with the International Open Table Tennis Tournament.

ARMOS undertook the production, transport and installation of the facility’s prefabricated bleachers.

 

 

Owner / Contractor
Designers
Year of completion
2003
Location